Abstract
This paper describes design studies, protective relaying, operating experience, and an automatic control system for a 115-kV capacitor installation involving back-to-back capacitors. The design studies evaluated switching concerns and equipment requirements for the installation. The paper details concerns which are unique to back-to-back capacitor installations. The automatic control system is designed to implement switching strategies based on power flow levels, system voltage, and equipment protection. The operating experience includes switch restrikes which are suspected to have caused equipment failures. These restrike transients are analyzed and solutions to the problem described.
Keywords
Automatic control; Biological system modeling; Capacitors; Electric fields; Moment methods; Power system analysis computing; Power system control; Power system protection; Power system relaying; Power transmission lines; Protective relaying; Surge protection; Switches; Transient analysis;
fLanguage
English
Journal_Title
Power Engineering Review, IEEE
Publisher
ieee
ISSN
0272-1724
Type
jour
DOI
10.1109/MPER.1987.5526766
Filename
5526766
Link To Document