DocumentCode
1269083
Title
Bulk system reliability-predictive indices
Volume
5
Issue
4
fYear
1990
fDate
11/1/1990 12:00:00 AM
Firstpage
1204
Lastpage
1213
Abstract
The second stage is described of an activity centered on identifying techniques and approaches for monitoring, measuring, predicting and applying reliability indices in the planning and operation of power systems. The present work identifies predictive indices that can be calculated, the degree to which they are calculated and used in practice, the commonality or lack of it between utilities, the perceived problems with their calculation or practical use, the limitations due to lack of data, computer resources and management understanding, and other related aspects
Keywords
power systems; reliability; bulk power systems; measurement; monitoring; operation; planning; prediction; predictive indices; reliability; utilities; Investments; Monitoring; Power engineering and energy; Power generation economics; Power measurement; Power system economics; Power system measurements; Power system modeling; Power system planning; Power system reliability;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.99371
Filename
99371
Link To Document