• DocumentCode
    1270194
  • Title

    High Rock Hydro Station control modernization of 60 year old plant

  • Author

    Stoner, J.E. ; Howell, R.E. ; Hartsock, R.S.

  • Author_Institution
    Duke Power Co., Charlotte, NC, USA
  • Volume
    3
  • Issue
    3
  • fYear
    1988
  • fDate
    9/1/1988 12:00:00 AM
  • Firstpage
    496
  • Lastpage
    502
  • Abstract
    The upgrade of three 1927 vintage hydrogenerators and the conversion from a manned station to a remote-controlled station is described. The equipment replaced, modified or added is discussed as well as the installation methods used to minimize loss of generation. The resulting benefits from a system operation standpoint are also discussed
  • Keywords
    hydroelectric power stations; telecontrol; High Rock Hydro Station; remote-controlled station; Aluminum; Automatic control; Centralized control; Control systems; Force control; Hydroelectric power generation; Power generation; Remote monitoring; Rivers; Turbines;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.8057
  • Filename
    8057