• DocumentCode
    1271402
  • Title

    Abridgment of transmission experience of the public service company of Colorado

  • Author

    Coover, M.S. ; Hardaway, W.D.

  • Author_Institution
    E. E., University of Colo, Boulder, Colo.
  • Volume
    47
  • Issue
    9
  • fYear
    1928
  • Firstpage
    633
  • Lastpage
    636
  • Abstract
    The 100,000-volt transmission lines of the Public Service Company of Colorado, which were completed in 1909, extended from the Shoshone hydro plant on the Colorado River across the Continental Divide to Denver and represent pioneering in high-voltage transmission at high altitudes. This combination of factors, coupled with a rapid expansion of the whole system in recent years, called for the satisfactory solution of many problems. The paper describes the system in a general way, and outlines some of the more salient operating difficulties that have arisen from time to time, as well as their remedies. Brief mention is also made of the method of load dispatching.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1928.6536653
  • Filename
    6536653