Abridgment of transmission experience of the public service company of Colorado
Author
Coover, M.S. ; Hardaway, W.D.
Author_Institution
E. E., University of Colo, Boulder, Colo.
Volume
47
Issue
9
fYear
1928
Firstpage
633
Lastpage
636
Abstract
The 100,000-volt transmission lines of the Public Service Company of Colorado, which were completed in 1909, extended from the Shoshone hydro plant on the Colorado River across the Continental Divide to Denver and represent pioneering in high-voltage transmission at high altitudes. This combination of factors, coupled with a rapid expansion of the whole system in recent years, called for the satisfactory solution of many problems. The paper describes the system in a general way, and outlines some of the more salient operating difficulties that have arisen from time to time, as well as their remedies. Brief mention is also made of the method of load dispatching.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1928.6536653
Filename
6536653
Link To Document