Title :
On Improving the Convergence and Accuracy of the Cumulant Method of Calculating Reliability and Production Cost
Author_Institution :
Sistecom, Ltda., Bogota, Colombia
Keywords :
Convergence; Costing; Costs; Frequency; Least squares approximation; Power system interconnection; Power system planning; Power system reliability; Production planning; Production systems;
Journal_Title :
Power Engineering Review, IEEE
DOI :
10.1109/MPER.1986.5527787