• DocumentCode
    1272677
  • Title

    The metering of E.H.T. supplies on the secondary side of step-down transformers

  • Author

    Morton, S.H.C.

  • Volume
    71
  • Issue
    429
  • fYear
    1932
  • fDate
    9/1/1932 12:00:00 AM
  • Firstpage
    507
  • Lastpage
    525
  • Abstract
    The paper deals with a method which could be employed to integrate the input to the primary side of step-down transformers by means of instruments connected in the secondary circuit. Primary maximum demand, both in kW and in kVA, is considered. In the case of the former a means of measurement is suggested, but to obtain the latter a calculation is necessary. Methods at present in use for the measurement of, and charging for, a supply of this kind are dealt with briefly.
  • Keywords
    eddy current losses; loss measurement; magnetic leakage; metering; power meters;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Journal of the Institution of
  • Publisher
    iet
  • Type

    jour

  • DOI
    10.1049/jiee-1.1932.0124
  • Filename
    5315221