• DocumentCode
    1272887
  • Title

    Abridgment of shunting of track circuit in a polyphase system of continuous inductive train control

  • Author

    Estwick, C.

  • Author_Institution
    General Railway Signal Co., Rochester, N. Y.
  • Volume
    47
  • Issue
    7
  • fYear
    1928
  • fDate
    7/1/1928 12:00:00 AM
  • Firstpage
    520
  • Lastpage
    523
  • Abstract
    Investigations into shunting of train control track circuits have been made in the field under operating conditions by observing the operation of the primary relay on a locomotive as a train runs into a track circuit´ in which there is a train ahead or an open switch and similar data have been obtained on the performance of the relay on trains in regular service. It is intended in this paper to present a method for predetermining the shunting characteristics of train control track circuits. The system discussed is a polyphase system of continuous inductive train control with cab signals employed on double-tracked steam roads. Curves are given which describe shunting conditions in train control track circuits and data are also given for comparison describing the shunting of the track relay on the same sections of track.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1928.6536915
  • Filename
    6536915