    Use of frequency changers for interconnection of power systems

  • Author

    Woodrow, H.R.

  • Author_Institution
    Brooklyn Edison Co., Brooklyn, N. Y.
  • Volume
    44
  • Issue
    4
  • fYear
    1925
  • fDate
    4/1/1925 12:00:00 AM
  • Firstpage
    354
  • Lastpage
    356
  • Abstract
    FOLLOWING an extensive study into the cost of power as delivered to the customer, the Brooklyn Edison Company adopted the policy of supplying all the increase in business at 60-cycle alternating-current and curtailing the direct-current load within the capacity of the existing substations. With the 25-cycle generation confined primarily to the supply of power to the direct-current system all new prime movers are being installed with 60-cycle generators. The 25-cycle system is therefore left in a position of barely holding its own.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1925.6537442
  • Filename
    6537442