Title :
Large steam turbine generators
Author :
Foster ; Freiburghouse ; Savage
Author_Institution :
Pasadena, Cal.
fDate :
4/1/1925 12:00:00 AM
Abstract :
A. M. Rossman: The built-up rotor construction which Mr. Foster describes is interesting to us because of an experience which we have had within the last two or three months with a solid forged rotor.
Journal_Title :
A.I.E.E., Journal of the
DOI :
10.1109/JAIEE.1925.6537454