• DocumentCode
    1281067
  • Title

    Present practise in the automatic operation of hydroelectric generating stations

  • Author

    Wensley, R.J.

  • Author_Institution
    Switchboard Engineering Department, Westinghouse Electric & Mfg. Co., East Pittsbugrh, Pa.
  • Volume
    43
  • Issue
    6
  • fYear
    1924
  • fDate
    6/1/1924 12:00:00 AM
  • Firstpage
    508
  • Lastpage
    513
  • Abstract
    Present practise in the design of automatic hydroelectric generating stations is reviewed. Various methods of starting and controlling are listed together with their limitations. Certain points in dispute, such as the W R2 required for speed regulation and brakes for bearing protection are presented in the hope that discussion will aid in clarifying the situation to such a degree as to permit of standardization of practise. A brief description of the sequence of operations in a modern automatic switching equipment, is given.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1924.6538341
  • Filename
    6538341