Abridgment of the fundamental plan of power supply of the Detroit edison company
Author
Dean, S.M.
Author_Institution
Engineering Division of the Detroit Edison Company, Detroit, Mich.
Volume
49
Issue
3
fYear
1930
fDate
3/1/1930 12:00:00 AM
Firstpage
205
Lastpage
210
Abstract
Experience indicates that if electric light and power systems are to expand indefinitely, without enormous obsolescence charges, a carefully coordinated engineering plan must be adopted and, so far as practicable, system extensions fitted to it. This paper sets forth the principles involved and the plan adopted by the Detroit Edison Company. The description of the area served and the classification of customers indicates that the system is essentially of the metropolitan substation type supplemented by a 120-kv. transmission system. The importance of selecting proper circuit voltages and arrangements and their bearing on service reliability, system simplicity, and cost is discussed. The underlying principles and the “Loose Linked” Power Area Plan adopted to accomplish those principles are set forth. These are supplemented by the plan for short circuit and stability control and the resultant classification of substations, power sources, and protection schemes. Those characteristics of major electrical equipment affected by the plan are outlined. Operating procedure and results are given.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1930.6538556
Filename
6538556
Link To Document