Abstract
Power requirements of the Commission´s 25-cycle Niagara System are outlined. Preliminary studies in connection with the choice of transmission voltage, location of terminal transformer station, etc., are discussed, together with the technical studies involved in the design of a system for transmitting 260,000 hp. 230 miles at 220,000-volts, and transforming same at the receiving end, for interconnection with the existing 110,000-volt system. The Toronto-Leaside 220,000-volt transformer station is described, together with the 220,000-volt transmission system. The paper concludes with a résumé of operating experience on the 220,000-volt system to date, and an outline of the future development of the system as at present anticipated.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1930.6538617
Filename
6538617
Link To Document