• DocumentCode
    1294410
  • Title

    Operation of generating units during serious system disturbances

  • Author

    Ganther, C.E. ; Mallett, A.A.

  • Author_Institution
    Cleveland Electric Illuminating Co., Cleveland. Ohio
  • Volume
    82
  • Issue
    10
  • fYear
    1963
  • Firstpage
    626
  • Lastpage
    628
  • Abstract
    Electric utility systems are subject to serious faults that may result in partial or complete system shutdowns. The effects of these faults can be minimized by operating procedures based on tested limitations of equipment under abnormal conditions. Various tests have been performed on generating units and their associated auxiliaries to determine these limitations
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1963.6540933
  • Filename
    6540933