DocumentCode
1307929
Title
ISO Net Surplus Collection and Allocation in Wholesale Power Markets Under LMP
Author
Li, Hongyan ; Tesfatsion, Leigh
Author_Institution
ABB, Inc., Raleigh, NC, USA
Volume
26
Issue
2
fYear
2011
fDate
5/1/2011 12:00:00 AM
Firstpage
627
Lastpage
641
Abstract
This study uses five-bus and 30-bus test cases to explore ISO net surplus (congestion rent) collections and allocations in wholesale power markets with grid congestion managed by locational marginal prices (LMPs). Price-sensitivity of demand and generator learning capabilities are taken as experimental treatment factors. A key finding is that conditions resulting in greater generator capacity withholding, hence higher and more volatile LMPs, also result in greater ISO net surplus collections that can be substantial in size. A key conclusion is that ISO net surplus collections should be used pro-actively to mitigate the conditions encouraging generator capacity withholding and hence high and volatile LMPs rather than to provide ex post support for LMP payment offsets and LMP volatility risk hedging as is currently the norm.
Keywords
power markets; pricing; 30-bus test; ISO net surplus; LMP payment offsets; LMP volatility risk; congestion rent; demand-bid price sensitivity; five-bus test; generator capacity withholding; grid congestion; locational marginal prices; wholesale power markets; Cost function; ISO; ISO standards; Marketing and sales; Power markets; Resource management; AMES Testbed; ISO net surplus (congestion rent); demand-bid price sensitivity; efficiency; learning; locational marginal pricing; welfare; wholesale power market;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2010.2059052
Filename
5559535
Link To Document