DocumentCode :
1308511
Title :
Overhead contact systems, construction and costs: Part I
Author :
Amberg, E.J.
Volume :
34
Issue :
6
fYear :
1915
fDate :
6/1/1915 12:00:00 AM
Firstpage :
1255
Lastpage :
1266
Abstract :
This paper, written with special reference to the New Haven electrification, gives a brief analysis of the systems and points to be considered in equipping trunk lines with overhead catenary construction. The paper is sub-divided into five parts, viz: catenary systems, supporting structures, sectionalization, special construction and cost data. Under “Catenary Systems” a short description is given of the various types used on the New Haven, stating the conditions for which each is best adapted. The same applies to the supporting structures and sectionalization. Under “Special Construction” only the cross-overs and river crossings have been considered more fully, while other special work has only been mentioned, as it was not within the scope of this paper to go into the details of construction. With reference to the cost data: It should be borne in mind that the figures given apply to the New Haven construction which was installed in the section with greatest traffic density, also through thickly settled communities. Therefore, the figures given will be of little value for comparison or estimating unless these conditions are equated.
Keywords :
Abstracts; Contacts; Copper; Rail transportation; Rivers; Steel; Wires;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Proceedings of the
Publisher :
ieee
ISSN :
0097-2444
Type :
jour
DOI :
10.1109/PAIEE.1915.6590213
Filename :
6590213
Link To Document :
بازگشت