• DocumentCode
    1308515
  • Title

    Construction, maintenance and cost of overhead contact systems: Part II — Catenary construction

  • Author

    Zogbaum, F.

  • Volume
    34
  • Issue
    6
  • fYear
    1915
  • fDate
    6/1/1915 12:00:00 AM
  • Firstpage
    1267
  • Lastpage
    1281
  • Abstract
    This paper is designed to give a general review of the problems involved in the maintenance and the cost of an overhead contact system of the catenary type, carrying high-voltage propulsion currents. The paper includes not only the contact system itself, but the transmission lines which form an integral part of the same. The subject treated is the catenary construction on the New York, Westchester & Boston Railway which is purely an electrical line, having no steam whatever. Several points will be brought out, such as the method of maintenance, the organization of the maintenance forces, the efficiency of insulation and other points which may be used in comparison and in discussion.
  • Keywords
    Contacts; Delays; Inspection; Maintenance engineering; Power transmission lines; Roads; Wires;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Proceedings of the
  • Publisher
    ieee
  • ISSN
    0097-2444
  • Type

    jour

  • DOI
    10.1109/PAIEE.1915.6590214
  • Filename
    6590214