Construction, maintenance and cost of overhead contact systems: Part II — Catenary construction
Author
Zogbaum, F.
Volume
34
Issue
6
fYear
1915
fDate
6/1/1915 12:00:00 AM
Firstpage
1267
Lastpage
1281
Abstract
This paper is designed to give a general review of the problems involved in the maintenance and the cost of an overhead contact system of the catenary type, carrying high-voltage propulsion currents. The paper includes not only the contact system itself, but the transmission lines which form an integral part of the same. The subject treated is the catenary construction on the New York, Westchester & Boston Railway which is purely an electrical line, having no steam whatever. Several points will be brought out, such as the method of maintenance, the organization of the maintenance forces, the efficiency of insulation and other points which may be used in comparison and in discussion.
Keywords
Contacts; Delays; Inspection; Maintenance engineering; Power transmission lines; Roads; Wires;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Proceedings of the
Publisher
ieee
ISSN
0097-2444
Type
jour
DOI
10.1109/PAIEE.1915.6590214
Filename
6590214
Link To Document