DocumentCode :
1311375
Title :
Production costing with explicit recognition of unit duty cycle effects
Author :
Ansari, Shoukat H. ; Patton, A.D.
Author_Institution :
Electr. Power Inst., Texas A&M Univ., College Station, TX, USA
Volume :
5
Issue :
3
fYear :
1990
fDate :
8/1/1990 12:00:00 AM
Firstpage :
789
Lastpage :
796
Abstract :
A novel probabilistic production costing algorithm called the OPCOST method is presented which recognizes the stochastic nature of the duty cycle of a unit and models the generation system with explicit consideration of such operating characteristics as the system generation reserve policy, unit start-up delay, unit start-up failure, unit commitment policy, and unit outage postponability. The OPCOST method has been used to compute production costs for EPRI synthetic generating system E, reduced version. The studies of the sample system have been carried out for two production costing methods, the OPCOST method and a traditional method. A comparison of the results obtained using the traditional method and the OPCOST method shows significant differences in the energies produced by the various categories of units
Keywords :
electric generators; EPRI synthetic generating system; OPCOST method; electric generators; generation reserve policy; probabilistic production costing algorithm; unit commitment policy; unit duty cycle effects; unit outage postponability; unit start-up delay; unit start-up failure; Character generation; Character recognition; Costing; Costs; Delay effects; Power generation; Power generation economics; Power system modeling; Production systems; Stochastic systems;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.65907
Filename :
65907
Link To Document :
بازگشت