DocumentCode :
1311932
Title :
Advanced reactor development rebounding
Author :
Sweet, W.
Volume :
34
Issue :
11
fYear :
1997
fDate :
11/1/1997 12:00:00 AM
Firstpage :
41
Lastpage :
48
Abstract :
Manufacturers are developing another generation of reactors, partly for emerging markets, partly to replace existing capacity. The reactors are easier to manufacture and operate, are safer, and have one-step certification. The EPRI-Energy initiative resulted in the successful design of three next-generation plants in the United States. General Electric Co., based in Fairfield, Conn., and ABB Combustion Engineering, Windsor, Conn., produced two “evolutionary” designs that built incrementally on existing reactors: CE´s Advanced Boiling Water Reactor (ABWR) and ABB´s System 80+ Standard Plant Design, a pressurized-water reactor (PWR). Westinghouse Electric Corp., headquartered in Pittsburgh, taking a rather more innovative and daring approach, developed a smaller advanced reactor called the AP-600. A 600-MW pressurized-water reactor, it incorporated passive safety features wherever possible. These three reactors are described
Keywords :
fission reactor design; fission reactor safety; ABB Combustion Engineering; ABWR; AP-600; Advanced Boiling Water Reactor; EPRI-Energy initiative; General Electric; PWR; System 80+; Westinghouse Electric; advanced reactor development; passive safety features; pressurized-water reactor; Design engineering; Gas industry; Inductors; Industrial control; Lead compounds; Natural gas industry; Nuclear power generation; Power engineering and energy; Power generation; Safety;
fLanguage :
English
Journal_Title :
Spectrum, IEEE
Publisher :
ieee
ISSN :
0018-9235
Type :
jour
DOI :
10.1109/6.632488
Filename :
632488
Link To Document :
بازگشت