DocumentCode
131443
Title
Analysis of Risk Assessment and Prevention for Foreign Project Based on Fuzzy Comprehensive Evaluation Method
Author
Gao Guohui
Author_Institution
Xingtai Univ., Xingtai, China
fYear
2014
fDate
10-11 Jan. 2014
Firstpage
99
Lastpage
102
Abstract
Foreign projects have large-scale excavation, high technical requirements, long construction period characters, especially affected by social and natural environment factors such as political and law,economic, social and cultural, technology and equipment etc. So, earlier identified and scientific evaluation the risk and prevention countermeasures is the key to the foreign engineering project successful implementation. By the method of fuzzy comprehensive risk assessment, this paper analysised the risk assessment and prevention for foreign engineering project.
Keywords
fuzzy set theory; project management; risk analysis; foreign engineering project; fuzzy comprehensive evaluation method; fuzzy comprehensive risk assessment; large-scale excavation; natural environment factors; risk assessment analysis; risk prevention analysis; social environment factors; Automation; Mechatronics; Assessment and Prevention; Foreign Engineering Project; Fuzzy comprehensive risk assessment;
fLanguage
English
Publisher
ieee
Conference_Titel
Measuring Technology and Mechatronics Automation (ICMTMA), 2014 Sixth International Conference on
Conference_Location
Zhangjiajie
Print_ISBN
978-1-4799-3434-8
Type
conf
DOI
10.1109/ICMTMA.2014.29
Filename
6802645
Link To Document