DocumentCode :
1315654
Title :
Steady-State Profit in a 2-unit Standby System
Author :
Kumar, Ashok
Author_Institution :
System Planning Study Project//W.R.D.T.C.//University of Roorkee//Roorkee-247667, U.P. INDIA
Issue :
2
fYear :
1976
fDate :
6/1/1976 12:00:00 AM
Firstpage :
105
Lastpage :
108
Abstract :
Three models are presented for a 2-unit standby system, Models 1 and 2 deal with a 2-unit warm-standby system with and without preventive maintenance (pm) to standby unit. Model 3 is a 2-unit cold-standby system with pm to operative unit. An income structure has been superimposed on the semi-Markov processes generated by the systems to obtain s-expected profit. For models 2 and 3, s-expected profit is suggested as the measure of maintenance effectiveness. Numerical examples are included to illustrate the results.
Keywords :
Costs; Degradation; Preventive maintenance; Reliability theory; Steady-state; Time measurement;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.1976.5214993
Filename :
5214993
Link To Document :
بازگشت