• DocumentCode
    1315956
  • Title

    Flexibility and FMS: an empirical analysis

  • Author

    Tombak, Mihkel ; De Meyer, A.

  • Author_Institution
    Eur. Inst. of Bus. Adm., Fontainebleau, France
  • Volume
    35
  • Issue
    2
  • fYear
    1988
  • fDate
    5/1/1988 12:00:00 AM
  • Firstpage
    101
  • Lastpage
    107
  • Abstract
    It is shown how the concerns of the managers of firms with flexible manufacturing system projects (FMS) differ from those of manufacturing firms without FMS projects. An economic model is developed from which two hypotheses are obtained. The first hypothesis is that firms were investing in FMS to deal with the variance in their inputs. The second proposition is that firms wished to use FMS to deal with the variance in their outputs. Through an analysis of manufacturing survey data it was found that firms planning to implement FMS were statistically more concerned about vendor quality and vendor lead times than non-FMS implementors. The FMS implementors also thought of their outputs as being too variable. Thus, it appears that the two hypotheses are empirically validated. However, it is also found that FMS implementors are planning on narrowing or standardizing their product lines. The inference drawn from these observations is that manufacturers in North America and Europe are using FMS for its ability to adapt to the variations in the system´s inputs and not for product design changes
  • Keywords
    economics; flexible manufacturing systems; management; Europe; FMS; North America; economic model; firms planning; flexible manufacturing system projects; managers; Europe; Flexible manufacturing systems; North America; Product design; Production systems; Project management; Pulp manufacturing; Raw materials; Testing; Uncertainty;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/17.6012
  • Filename
    6012