DocumentCode
1316161
Title
Automatic substations for heavy city service
Author
Wensley, R.J.
Author_Institution
Westinghouse Electric & Manufacturing Co.
Volume
39
Issue
4
fYear
1920
fDate
4/1/1920 12:00:00 AM
Firstpage
359
Lastpage
364
Abstract
WHEN automatically controlled substation equipment was in the development stage, the general consensus of opinion was that its greatest field lay in relieving the smaller interurban systems of a greater portion of their substation operating labor. While many such systems have installed one or more automatic substations, they have not displayed the interest in the matter that was expected. In many cases the officials have professed their total inability to finance the new apparatus even though the investment would show a very attractive saving.
Keywords
Cities and towns; Copper; Investment; Power cables; Rail transportation; Schedules; Substations;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Journal of the
Publisher
ieee
ISSN
0360-6449
Type
jour
DOI
10.1109/JoAIEE.1920.6591569
Filename
6591569
Link To Document