• DocumentCode
    1316161
  • Title

    Automatic substations for heavy city service

  • Author

    Wensley, R.J.

  • Author_Institution
    Westinghouse Electric & Manufacturing Co.
  • Volume
    39
  • Issue
    4
  • fYear
    1920
  • fDate
    4/1/1920 12:00:00 AM
  • Firstpage
    359
  • Lastpage
    364
  • Abstract
    WHEN automatically controlled substation equipment was in the development stage, the general consensus of opinion was that its greatest field lay in relieving the smaller interurban systems of a greater portion of their substation operating labor. While many such systems have installed one or more automatic substations, they have not displayed the interest in the matter that was expected. In many cases the officials have professed their total inability to finance the new apparatus even though the investment would show a very attractive saving.
  • Keywords
    Cities and towns; Copper; Investment; Power cables; Rail transportation; Schedules; Substations;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Journal of the
  • Publisher
    ieee
  • ISSN
    0360-6449
  • Type

    jour

  • DOI
    10.1109/JoAIEE.1920.6591569
  • Filename
    6591569