• DocumentCode
    131674
  • Title

    Scheduling and Management for Railway Lines Network Based on Risk Evaluation Model for Collaborative Projects

  • Author

    Wu Jing

  • Author_Institution
    Guangzhou Inst. of Railway Technol., Guangzhou, China
  • fYear
    2014
  • fDate
    10-11 Jan. 2014
  • Firstpage
    585
  • Lastpage
    588
  • Abstract
    The risk of collaborative projects is complex, and generally no project can be used as a reference. So, the method which is used to evaluate the risk of traditional project is not proper for the collaborative project. Combining the triangular fuzzy number and analytic hierarchy process (AHP) method, a model for evaluating the risk of collaborative project is established in this paper.And a collaborative project is introduced as an example to demonstrate the process and validity of the model.
  • Keywords
    analytic hierarchy process; fuzzy set theory; railways; risk analysis; scheduling; AHP method; analytic hierarchy process; collaborative projects; railway lines network management; railway lines network scheduling; risk evaluation model; triangular fuzzy number; Automation; Mechatronics; Analytic Hierarchy Process; Collaborative Project; Risk Appraisal; Triangular Fuzzy Number;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Measuring Technology and Mechatronics Automation (ICMTMA), 2014 Sixth International Conference on
  • Conference_Location
    Zhangjiajie
  • Print_ISBN
    978-1-4799-3434-8
  • Type

    conf

  • DOI
    10.1109/ICMTMA.2014.143
  • Filename
    6802760