DocumentCode :
131894
Title :
Revision of the rules for carrying out low-voltage live working on electrical networks
Author :
Didier, C. ; Heroin, G.
Author_Institution :
SERECT, RTE CNER, Wittelsheim, France
fYear :
2014
fDate :
21-23 May 2014
Firstpage :
1
Lastpage :
4
Abstract :
Low-voltage live working on electrical networks has been carried out in France since the 1960s. The Working Conditions (WCs) that cover these working activities are updated regularly to take account of lessons learned in the field. This article presents an overview of the improvement process that led to a revision of the low-voltage Working Conditions in 2013: an operating experience system and progress axes identified; a innovative method in the service of the operator and his local supervisor; the implication of all stakeholders for accompanying change.
Keywords :
electric shocks; electricity supply industry deregulation; government policies; WCs; electrical networks; low-voltage live working; low-voltage working conditions; operating experience system; progress axes; Electric potential; Electric shock; Training;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Live Maintenance (ICOLIM), 2014 11th International Conference on
Conference_Location :
Budapest
Type :
conf
DOI :
10.1109/ICOLIM.2014.6934392
Filename :
6934392
Link To Document :
بازگشت