DocumentCode
1320688
Title
Time series forecasting of utility load duration curves
Author
Maybee, S. ; Uri, N.D.
Author_Institution
Univ. of Colorado, Boulder, CO, USA
Volume
4
Issue
1
fYear
1979
Firstpage
4
Lastpage
8
Abstract
The load duration curve is a primary tool used in the economic analysis of electric utility operations and for the purpose of planning new construction. In general equilibrium models and also in other models using linear programming, piecewise linear approximations to the load duration curve are required. This paper endeavors to develop a forecasting model for such discrete approximations using Box-Jenkins time series analysis. A model is structured and estimated for six, twenty, and fifty discrete approximations for two utility regions in the United States. The forecast results are extremely good, indicating that while a larger number of approximations perform marginally better, there is nothing to lessen the advantage of using only a six-step approximation.
Keywords
load distribution; management; power system analysis computing; Box Jenkins time series analysis; USA electric utilities; approximation step number optimisation; discrete approximations; economic analysis; electric utility operations; forecasting model; load forecasting; long term forecasting; piecewise linear approximations; planning new construction; time series forecasting; two utility regions; utility load duration curves; Approximation methods; Biological system modeling; Forecasting; Load modeling; Piecewise linear approximation; Predictive models; Time series analysis;
fLanguage
English
Journal_Title
Electrical Engineering Journal, Canadian
Publisher
ieee
ISSN
0700-9216
Type
jour
DOI
10.1109/CEEJ.1979.6592401
Filename
6592401
Link To Document