• DocumentCode
    1321181
  • Title

    Minimizing Life Test Costs

  • Author

    Taub, Theodore W.

  • Author_Institution
    Lockheed Missiles and Space Company, Sunnyvale, Calif.; 1470 Hollidale Court, Los Altos, Calif. 94022.
  • Issue
    2
  • fYear
    1971
  • fDate
    5/1/1971 12:00:00 AM
  • Firstpage
    84
  • Lastpage
    85
  • Abstract
    Requirements for unusual operating environments and high reliability necessitate qualification and life tests of new or changed components. Considering these requirements, test planners determine test environments, instrumentation, and the number of parts and elapsed hours for the life test. A technique is presented to deal with one specific aspect of test planning¿the selection of that number of test units that will result in the lowest total cost of the life test.
  • Keywords
    Building materials; Construction industry; Costs; Economics; Equations; Instruments; Life testing; Production; Qualifications; Reliability engineering;
  • fLanguage
    English
  • Journal_Title
    Reliability, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9529
  • Type

    jour

  • DOI
    10.1109/TR.1971.5216090
  • Filename
    5216090