DocumentCode :
1324821
Title :
Assessing strategies for obtaining advanced engineering technologies with highly uncertain benefits
Author :
Gagnon, Roger J.
Author_Institution :
Babcock Grad. Sch. of Manage., Wake Forest Univ., Winston-Salem, NC, USA
Volume :
38
Issue :
3
fYear :
1991
fDate :
8/1/1991 12:00:00 AM
Firstpage :
210
Lastpage :
223
Abstract :
Comprehensive financial methods are presented which can evaluate alternative strategies for obtaining advanced engineering technologies, such as CAD/CAE, when the values of the benefits are highly uncertain or even unknown. The methods integrate traditional financial discounting procedures for known cost data with expert opinions for estimating benefit values and incorporate engineering performance improvement, project volumes ranging from one to infinity, various time horizons, and a comprehensive sensitivity analysis. Realistic strategies and actual case data are used to illustrate the procedures. Impacts from project volume, project benefit values and the selection of the financial evaluation criterion are discussed
Keywords :
CAD/CAM; economics; investment; management; project engineering; sensitivity analysis; CAD/CAE; advanced engineering technologies; cost; economics; financial discounting; investment; management; performance; project; sensitivity analysis; Appropriate technology; Cost benefit analysis; Design automation; Design engineering; Engineering management; Performance analysis; Product design; Productivity; Research and development management; Technology management;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/17.83754
Filename :
83754
Link To Document :
بازگشت