DocumentCode :
1328091
Title :
Nonoptimality of static-priority policies in unreliable two-part-type manufacturing systems
Author :
De Vericourt, Francis ; Dallery, Yves
Author_Institution :
Lab. d´´Inf. de Paris, Univ. Pierre et Marie Curie, Paris, France
Volume :
45
Issue :
2
fYear :
2000
fDate :
2/1/2000 12:00:00 AM
Firstpage :
309
Lastpage :
311
Abstract :
In this note, we show that for the two-part-type, one-machine continuous flow model, a static-priority policy cannot be optimal when the hedging point of the part of highest priority is positive. This result was previously conjectured by Veatch and Caramanis
Keywords :
optimal control; production control; one-machine continuous flow model; static-priority policy nonoptimality; unreliable two-part-type manufacturing systems; Context modeling; Continuous production; Cost function; Job shop scheduling; Manufacturing systems; Optimal control; Production control; Stochastic systems;
fLanguage :
English
Journal_Title :
Automatic Control, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9286
Type :
jour
DOI :
10.1109/9.839955
Filename :
839955
Link To Document :
بازگشت