    Techniques and lessons learned from a rapid response deployment of an automated test system

  • Author

    Leammukda, M. ; Jalbert, B. ; Lax, A.

  • Author_Institution
    Syst. Integration, Test, & Evaluation Div., Charles Stark Draper Lab., Cambridge, MA, USA
  • fYear
    2014
  • fDate
    15-18 Sept. 2014
  • Firstpage
    309
  • Lastpage
    313
  • Abstract
    Well known and established requirements are an ideal scenario for developing test equipment; however, for projects that have aggressive schedules and short period of performances, test requirements are constantly evolving as the final design of the Unit-Under-Test (UUT) materializes. Additionally, test equipment ends up getting shoehorned into a full rate production environment when considerations for such deployment were not factored into the initial design. Many aspects need to be considered early on in the test system development to allow for changes in the requirements. In one of Draper Laboratory´s early opportunities to develop a production test system, there are several lessons that can be learned from the process. One important decision is the hardware platform of the test system. By leveraging commercial-off-the-shelf (COTS), industry-standard equipment with an open architecture, the modular test system is adaptable and scalable so that additional requirements can be met without major redesign efforts. Other considerations to be made include designing for automation, training for efficiency with using software tools, hardware sparing strategies, UUT health and welfare concepts, staffing, facility needs, validation of the test system, error handling, data logging with post processing in mind, data archiving, and more. All of these factors and techniques are key to the rapid development of a test system that will meet the needs of a fastpaced project.
  • Keywords
    automatic test equipment; error handling; military aircraft; military standards; software tools; COTS; Draper Laboratory; UUT; UUT health and welfare concepts; automated test system development; commercial-off-the-shelf; data logging; error handling; hardware sparing strategy; industry standard equipment; modular test system; open architecture; production test system; rapid response deployment; software tools; test requirements; unit under test; Hardware; Production; Schedules; Security; Software; Test equipment; lessons learned; rapid response; test station;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON, 2014 IEEE
  • Conference_Location
    St. Louis, MO
  • Print_ISBN
    978-1-4799-3389-1
  • Type

    conf

  • DOI
    10.1109/AUTEST.2014.6935162
  • Filename
    6935162