DocumentCode
1331564
Title
Teamworking wins the relay race
Author
Pannell, Richard
Author_Institution
GEC Alsthom Transmission & Distribution Projects Ltd., Stafford, UK
Volume
42
Issue
5
fYear
1996
fDate
9/1/1996 12:00:00 AM
Firstpage
199
Lastpage
201
Abstract
Rapid prototyping, Taguchi, design for manufacture-what do these modern manufacturing techniques mean in practice? The author describes how they were combined with teamworking by GEC ALSTHOM in taking an innovative approach to designing a new product, the Prima plug-in rapid wire integrated multi-mount auxiliary for use in protection and control environments
Keywords
design for manufacture; electronic equipment manufacture; product development; project engineering; quality control; GEC ALSTHOM; Prima plug-in rapid wire integrated multi-mount auxiliary; Taguchi; control environment; design for manufacture; innovative approach; protection environment; rapid prototyping; stereolithography; teamworking;
fLanguage
English
Journal_Title
IEE Review
Publisher
iet
ISSN
0953-5683
Type
jour
DOI
10.1049/ir:19960510
Filename
533340
Link To Document