• DocumentCode
    1338762
  • Title

    Cyclic scheduling of a hoist with time window constraints

  • Author

    Chen, Haoxun ; Chu, Chengbin ; Proth, Jean-marie

  • Author_Institution
    Syst. Eng. Inst., Xi´´an Univ., China
  • Volume
    14
  • Issue
    1
  • fYear
    1998
  • fDate
    2/1/1998 12:00:00 AM
  • Firstpage
    144
  • Lastpage
    152
  • Abstract
    This paper proposes a model and a related algorithm for generating optimal cyclic schedules of hoist moves with time window constraints in a printed circuit board (PCB) electroplating facility. The algorithm is based on the branch and bound approach and requires the solution of a specific class of linear programming problems (LPP). These LPP are equivalent to the problems of the cycle time evaluation in bi-valued graphs. Computational experience is presented to compare the results obtained using this new algorithm with the ones proposed in the literature
  • Keywords
    coating techniques; electroplating; graph theory; hoists; materials handling; optimisation; printed circuit manufacture; production control; LP; PCB electroplating facility; bi-valued graphs; branch-and-bound algorithm; cycle time evaluation; hoist moves; linear programming; optimal cyclic schedules; printed circuit board; time window constraints; Chemicals; Computer industry; Iterative algorithms; Job shop scheduling; Linear programming; Materials handling; Printed circuits; Processor scheduling; Scheduling algorithm; Time factors;
  • fLanguage
    English
  • Journal_Title
    Robotics and Automation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1042-296X
  • Type

    jour

  • DOI
    10.1109/70.660860
  • Filename
    660860