• DocumentCode
    1347284
  • Title

    Optimal Inspection Policy For Multistage Production Process With Alternate Inspection Plans

  • Author

    Gupta, Ashok ; Gupta, Hariom

  • Author_Institution
    Dept. of Electrical Engineering; Government College of Engineering; Ujjain 456 010 (M.P.) INDIA.
  • Issue
    2
  • fYear
    1981
  • fDate
    6/1/1981 12:00:00 AM
  • Firstpage
    161
  • Lastpage
    162
  • Abstract
    This paper considers a multistage production process with alternate inspection plans. At each stage a number of alternate inspection plans with different cost and reliabilities may be available. Since more reliable inspections are more costly it is essential to find out a compromise between the reliability and cost. A mathematical model is developed. Dynamic programming is used to determine at each stage that out of the available inspection plans (including the case of no inspection) which one will result in minimum s-expected total cost per item.
  • Keywords
    Costs; Dynamic programming; Educational institutions; Government; Inspection; Manufacturing processes; Mathematical model; Performance evaluation; Production; Reliability engineering; Alternate inspection plans; Inspection reliability; Locating inspectors; Multistage production process; s-expected cost;
  • fLanguage
    English
  • Journal_Title
    Reliability, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9529
  • Type

    jour

  • DOI
    10.1109/TR.1981.5221014
  • Filename
    5221014