DocumentCode :
1347310
Title :
Modified Periodic Replacement with Minimal Repair at Failure
Author :
Nakagawa, Toshio
Author_Institution :
Department of Mathematics; Meijo University; Nagoya 468 JAPAN.
Issue :
2
fYear :
1981
fDate :
6/1/1981 12:00:00 AM
Firstpage :
165
Lastpage :
168
Abstract :
This paper summarizes four models of modified periodic replacement with minimal repair at failures when the scheduled replacement time is specified. If a failure occurs just before the replacement time, then three models are: A) a unit remains as it is until the replacement time comes, B) a unit is replaced by one of spares, C) a unit is replaced by a new unit. If a failure occurs well before replacement time then model D is: a unit is replaced at failure or at time T1. The s-expected costs for each model are obtained and the optimum policies are discussed.
Keywords :
Convolution; Cost function; Equations; Hazards; Probability; Reliability theory; Minimal repair; Modified replacement; Optimization; s-Expected cost;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.1981.5221018
Filename :
5221018
Link To Document :
بازگشت