Title :
A novel whole-view test approach for onsite commissioning in smart substation
Author :
Shi Jing ; Qi Huang ; Jie Wu ; Wei Zhen
Author_Institution :
Sch. of Energy Sci. & Eng., UESTC, Chengdu, China
Abstract :
Substation is the heart of an interconnected power system. With the development of smart grid, the concept of smart substation is proposed. The objectives of smart substation are to build an efficient networked information management platform, increasing the flexibility in the organization and distribution of the information, and greatly enhancing the capabilities of information exchanging and processing in substation. However, the onsite commissioning of smart substation is much more complex than that of traditional ones, because the digital information is more difficult to measure and a complex networked information flow needs to be testified. In this paper, a novel test approach, based on wireless time synchronization and distributed injection of simulated data, is proposed for the onsite commissioning of the secondary system in a smart substation. The system components are built and tested. Technical issues are solved to satisfy the requirements of onsite commissioning, and the built system has been used for commissioning services of several newly built smart substations.
Keywords :
commissioning; power system management; smart power grids; substation automation; commissioning services; complex networked information flow; digital information; distributed injection; information exchanging; information processing; interconnected power system; networked information management platform; onsite commissioning; secondary system; simulated data; smart grid; smart substation; while-view test approach; wireless time synchronization; Fluid flow measurement; Heart; Information management; Organizations; Smart grids; Substations;
Conference_Titel :
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location :
National Harbor, MD
DOI :
10.1109/PESGM.2014.6938927