Title :
First year´s operating experience with new control equipment on 100 New York City subway cars
Author_Institution :
General Electric Company, Erie, Pa.
fDate :
3/1/1958 12:00:00 AM
Abstract :
THE OPERATION of multiple-unit electric trains in modern high-speed rapid-transit service demands an extremely high degree of equipment reliability. This performance must be achieved with a minimum of time and labor for maintenance. Efforts to achieve these objectives have, in recent years, produced notable advances in the design of both propulsion and control equipment.
Keywords :
Acceleration; Cities and towns; Contactors; Inspection; Maintenance engineering;
Journal_Title :
American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
DOI :
10.1109/TAI.1958.6367397