• DocumentCode
    1348190
  • Title

    Reduced Tree Search for Optimal Preventive Maintenance of Generating Facilities

  • Author

    Gupta, Ashok

  • Author_Institution
    Electrical Engineering Dept.; Government College of Engineering; Ujjain 456 010 (M.P.) INDIA.
  • Issue
    5
  • fYear
    1981
  • Firstpage
    476
  • Lastpage
    477
  • Abstract
    The problem of preventive maintenance (pm) scheduling is to find the intervals and the sequence in which the generating facilities are to go pm in a specified time period so that the cost of maintenance is minimized. This paper formulates the pm problem under practical constraints and generates solution vectors as branches of a tree. Termination rules avoid generating a large number of solution vectors, and the optimal solution is obtained quickly.
  • Keywords
    Costs; Delay; Educational institutions; Government; Linear programming; Power engineering and energy; Power generation; Preventive maintenance; Search methods; Security; 0-1 integer programming; Preventive maintenance; Solution vector; Termination rule; Tree search;
  • fLanguage
    English
  • Journal_Title
    Reliability, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9529
  • Type

    jour

  • DOI
    10.1109/TR.1981.5221178
  • Filename
    5221178