DocumentCode :
1349371
Title :
A Modified Block Replacement with Two Variables
Author :
Nakagawa, Toshio
Author_Institution :
Department of Mathematics; Meijo University; Nagoya 468 JAPAN.
Issue :
4
fYear :
1982
Firstpage :
398
Lastpage :
400
Abstract :
This paper considers a modified block replacement policy in which a unit is replaced at failure during (0, T0) and at scheduled replacement time T. If a failure occurs in an interval (T0, T), then the unit remains as it is until T. The mean cost rate is obtained, using the results of renewal theory. The model with two variables is transformed into one variable and the optimum policy is discussed. An example shows how to compute the optimum T0* and T* when the failure time of the unit has a gamma distribution.
Keywords :
Calculus; Cost function; Distributed computing; Equations; Processor scheduling; Reliability theory; Tin; Block replacement; Two variables;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.1982.5221391
Filename :
5221391
Link To Document :
بازگشت