• DocumentCode
    135315
  • Title

    Testing market alternatives for renewable integration using a reduced network model

  • Author

    Price, James E.

  • Author_Institution
    California ISO, Folsom, CA, USA
  • fYear
    2014
  • fDate
    27-31 July 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    California´s increasing use of renewable energy will result in profound changes in markets and system operations as the resource portfolio shifts away from heavy reliance on natural gas-fueled generation. The California ISO is implementing new market products to provide a flexibility reserve, and continues to evaluate other market changes to respond to uncertainty in intermittent resources´ output. The residual unit commitment (RUC) process is the final step of the day-ahead market, to ensure adequate resources for realtime dispatch. This study applies a 240-bus test system for the California and WECC regional market, to examine whether the RUC process could be improved by considering uncertainty in demand and intermittent resource output, through stochastic unit commitment.
  • Keywords
    power generation dispatch; power generation scheduling; power markets; renewable energy sources; California ISO; RUC process; WECC regional market; day-ahead market; intermittent resources output; natural gas-fueled generation; renewable energy; renewable integration; residual unit commitment process; resource portfolio; testing market alternatives; Generators; Optimization; Real-time systems; Reliability; Schedules; Stochastic processes; Uncertainty; market model; renewable energy; stochastic unit commitment; unit commitment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PES General Meeting | Conference & Exposition, 2014 IEEE
  • Conference_Location
    National Harbor, MD
  • Type

    conf

  • DOI
    10.1109/PESGM.2014.6939259
  • Filename
    6939259