• DocumentCode
    1354585
  • Title

    Sections and branches

  • Volume
    28
  • Issue
    3
  • fYear
    1909
  • fDate
    3/1/1909 12:00:00 AM
  • Firstpage
    29
  • Lastpage
    44
  • Abstract
    At the regular meeting of this Branch, held January 7, 1909, Mr. A. P. Strong read a paper on “The Design of the Conduit System for a Multi-office Telephone System.” He first took up the two methods of laying conduits; the one based on present needs, and the other on those of the future. A method of making estimates of future business from the population and conditions in the districts under consideration was discussed. The question of deciding between a central office system and a multiple office system was then considered, and it was shown that the conditions in a large city favor the latter. The economical distribution of office, was the next point taken up, and the conclusion was reached that, in general, the best location is at the line center or center of distribution.
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Proceedings of the
  • Publisher
    ieee
  • ISSN
    0097-2444
  • Type

    jour

  • DOI
    10.1109/PAIEE.1909.6660237
  • Filename
    6660237