DocumentCode :
1354812
Title :
R&M 2000 ߞ Coequality Between R&M, Cost, Performance, and Schedule
Author :
Jaquess, Robert A.
Author_Institution :
Martin Marietta Denver Aerospace; POBox 179; Denver, Colorado 80201 USA.
Issue :
3
fYear :
1987
Firstpage :
331
Lastpage :
334
Abstract :
The US Air Force R&M 2000 Action Plan makes R&M equal to technical performance and schedule in source selection, proposal evaluation and contract performance. This paper discusses that coequality. R&M 2000 provides an opportunity for the practitioners to achieve a new high water mark in technology by institutionalizing the objectives toward a common cause.
Keywords :
Associate members; Contracts; Costs; Design engineering; Human factors; Job shop scheduling; Logistics; Maintenance engineering; Proposals; Reliability engineering; Coequality; Cost avoidance; Double-R/Half-M; Maintainability; R&M 2000 Action Plan; Reliability; Savings leverage; and Producibility;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.1987.5222391
Filename :
5222391