DocumentCode :
135882
Title :
New regulatory battery maintenance requirements as mandated by NERC PRC-005-2/3
Author :
Searles, Chris ; Cantor, William
Author_Institution :
BAE Batteries USA, IEEE Stationary Battery Comm., Somerset, WI, USA
fYear :
2014
fDate :
27-31 July 2014
Firstpage :
1
Lastpage :
5
Abstract :
The major grid failure of August 2003 led Congress to pass the Electric Modernization Act of 2005. This act established the Federal Electric Reliability Commission (FERC) to impose regulatory standards on all functional entities that are a part of the Bulk Power System (BPS), sometimes referred to as the Bulk Electric System (BES). PRC-005-2/3 now requires all utilities to follow minimum maintenance requirements for batteries within a prescribed time interval for all equipment connected to the BPS/BES. This paper addresses the specific requirements that every electric utility/functional entity that ties into the BPS/BES must follow with an explanation of the difference between reliability as defined within the NERC glossary vs. the IEEE Stationary Battery Committee Standards and Guidelines.
Keywords :
maintenance engineering; power grids; power system reliability; secondary cells; IEEE stationary battery committee standards; NERC PRC-005-2/3; bulk electric system; bulk power system; electric modernization act; electric utility; federal electric reliability commission; functional entity; grid failure; maintenance requirements; regulatory battery maintenance requirement; Batteries; Battery charge measurement; Calendars; Maintenance engineering; Power system reliability; Reliability; Standards; (1) batteries; (2) maintenance engineering; (3) power system protection; (4) power system reliability; (5) substation protection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location :
National Harbor, MD
Type :
conf
DOI :
10.1109/PESGM.2014.6939811
Filename :
6939811
Link To Document :
بازگشت