DocumentCode
1358821
Title
Operational tests on HVDC thyristor modules in a synthetic test circuit for the Sylmar East Restoration Project
Author
Bauer, T. ; Lips, H.P. ; thiele, G. ; Tylutki, T. ; Uder, M.
Author_Institution
Siemens AG, Erlangen, Germany
Volume
12
Issue
3
fYear
1997
fDate
7/1/1997 12:00:00 AM
Firstpage
1151
Lastpage
1158
Abstract
According to IEC 700 and IEEE 857, operational tests on HVDC thyristor modules can be performed either in a six-pulse back-to-back test circuit or in a synthetic test circuit. Because of the high rating of modern thyristors the use of a six-pulse bridge configuration would require facilities with a high installed capacity. In a synthetic test circuit even high current and voltage stresses can be represented using less than 1/100 of that installed capacity. Thus, synthetic test circuits are an economical alternative to test a representative part of a modern thyristor valve. The paper describes the operational tests on thyristor modules for the Sylmar East Restoration Project which were completely carried out in a synthetic test circuit
Keywords
HVDC power convertors; substations; testing; thyristor convertors; HVDC thyristor modules; Sylmar East Restoration Project; high current stresses; high voltage stresses; operational tests; six-pulse back-to-back test circuit; synthetic test circuit; Capacitors; Circuit testing; Earthquakes; Fires; HVDC transmission; Performance evaluation; Snubbers; Thyristors; Valves; Voltage;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.636927
Filename
636927