• DocumentCode
    1359401
  • Title

    Berlin bounds from insular to integrated operations [electricity supply]

  • Author

    Bechtold, Klaus

  • Author_Institution
    Berliner Kraft- und Licht Bewag-AG, Germany
  • Volume
    10
  • Issue
    1
  • fYear
    1997
  • fDate
    1/1/1997 12:00:00 AM
  • Firstpage
    20
  • Lastpage
    25
  • Abstract
    After 40 years of insular operation, the Bewag electric utility is now part of the Western European power supply grid. This article looks back at the power supply situation that developed in the West and East during the post-war period and describes the measures required to establish comparable power supply conditions after unification, the integration into the western European grid system and the control system put in place to optimize operations
  • Keywords
    SCADA systems; electricity supply industry; history; power system control; power system interconnection; Bewag electric utility; Germany; Western European power supply grid; interconnection; power network control system; power supply conditions; Aging; Cities and towns; Cogeneration; Control systems; Heat pumps; History; Large-scale systems; Power generation; Power measurement; Power supplies;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.560816
  • Filename
    560816