Abstract :
Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation and transmission. Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are: (1) to propose a method to estimate MDCC; (2) to demonstrate the significant intra- and inter-utility variations in MDCC; and (3) to discuss the usefulness of these cost estimations in integrated resource planning
Keywords :
costing; distribution networks; economics; electricity supply industry; cost estimations; electricity distribution; integrated resource planning; inter-utility transactions; intra-utility transactions; location; marginal capacity costs; time; Costs; Dispatching; Environmental economics; Investments; Power generation; Power markets; Power system planning; Pricing; Production; Timing;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.667383
Filename :
667383
Link To Document :
بازگشت