Title :
Variations in area- and time-specific marginal capacity costs of electricity distribution
Author :
Heffner, Grayson ; Woo, C.K. ; Horii, Brian ; Lloyd-Zannetti, Debra
Author_Institution :
Customer Syst. Div., Electr. Power Res. Inst., Washington, DC, USA
fDate :
5/1/1998 12:00:00 AM
Abstract :
Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation and transmission. Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are: (1) to propose a method to estimate MDCC; (2) to demonstrate the significant intra- and inter-utility variations in MDCC; and (3) to discuss the usefulness of these cost estimations in integrated resource planning
Keywords :
costing; distribution networks; economics; electricity supply industry; cost estimations; electricity distribution; integrated resource planning; inter-utility transactions; intra-utility transactions; location; marginal capacity costs; time; Costs; Dispatching; Environmental economics; Investments; Power generation; Power markets; Power system planning; Pricing; Production; Timing;
Journal_Title :
Power Systems, IEEE Transactions on