DocumentCode
1361819
Title
Aerospace: Shuttle firsts put to the test: After its near-perfect maiden flight, Columbia needs fine tuning for a trip that will highlight its remote arm and its first payload
Author
Lombardo, T.G. ; Mokhoff, N.
Author_Institution
`Spectrum´, New York, NY, USA
Volume
18
Issue
8
fYear
1981
Firstpage
34
Lastpage
39
Abstract
Discusses the 50 deviations from expected performance from countdown to landing that occurred during the first flight of NASA´s Shuttle and what action will be necessary to correct them in time for the first payload flight.
Keywords
space vehicles; Shuttle; deviations; expected performance; Computers; NASA; Orbits; Payloads; Space vehicles; Tiles;
fLanguage
English
Journal_Title
Spectrum, IEEE
Publisher
ieee
ISSN
0018-9235
Type
jour
DOI
10.1109/MSPEC.1981.6369784
Filename
6369784
Link To Document