Title :
Power/energy: Southern California Edison bets on energy alternatives: Two projects in the Mojave Desert are imminent ¿ The first a solar thermal plant and the other a coal-gasification plant
Author_Institution :
`Spectrum´, New York, NY, USA
Abstract :
Describes a 10 MW solar thermal generating plant soon to come on stream and a 100 MW integrated coal gasification combined cycle power plant scheduled to start in late 1983.
Keywords :
coal; gas turbine power stations; solar power stations; steam power stations; 10 MW; 100 MW; energy alternatives; integrated coal gasification combined cycle power plant; solar thermal generating plant; Arrays; Heating; Mirrors; Poles and towers; Receivers; Sun; Turbines;
Journal_Title :
Spectrum, IEEE
DOI :
10.1109/MSPEC.1981.6369785