DocumentCode
1364881
Title
A bold effort in Vermont [History]
Author
Sulzberger, Carl
Volume
7
Issue
6
fYear
2009
Firstpage
100
Lastpage
110
Abstract
This paper is the third biennial issue having wind-produced electrical energy as its theme. As with the earlier two issues, a major focus is the integration of wind power plants into electric utility systems. As such, it is fitting that our history offering describes the Smith-Putnam wind turbine that operated on the summit of Grandpa´s Knob, a mountain about 12 mi (19 km) west of Rutland, Vermont, during the early 1940s. Having a capacity of 1.25 MW, it was the world´s largest wind turbine at that time and among the first to deliver alternating current (ac) electrical energy into an electric utility transmission and distribution system.
Keywords
wind power plants; wind turbines; Smith-Putnam wind turbine; Vermont; electric utility distribution system; electric utility systems; electric utility transmission system; wind power plants; wind-produced electrical energy; Design engineering; Generators; Government; History; Power engineering and energy; Power industry; Production; Wind energy; Wind energy generation; Wind turbines;
fLanguage
English
Journal_Title
Power and Energy Magazine, IEEE
Publisher
ieee
ISSN
1540-7977
Type
jour
DOI
10.1109/MPE.2009.934586
Filename
5233742
Link To Document