Back on line in 72 hours: To reconnect Mexico City´s complex electric grid after last September´s earthquake, engineers zeroed in on the most critical repairs, aided by remote operation of substations
Author_Institution :
Mexican Light & Power Co., Mexico
fDate :
6/1/1986 12:00:00 AM
Abstract :
Describes the Mexican Light and Power company´s efforts to reconnect Mexico City´s complex electric grid after the September 1985 earthquake. The engineers zeroed in on the most critical repairs, aided by remote operation of substations, and restored power to the company´s 3,200,000 customers in only 72 hours. The author discusses getting accurate damage reports, keeping the work crews supplied, and work crew medical and safety factors.
Keywords :
distribution networks; earthquakes; electricity supply industry; substations; Mexico City; damage reports; electric grid; power supply reconnection; safety; substations; Buildings; Cities and towns; Earthquakes; Electricity; Maintenance engineering; Power cables; Switches;
Journal_Title :
Spectrum, IEEE
DOI :
10.1109/MSPEC.1986.6370931