Title :
The first stage of the electrification of the Estrada de Ferro Santos a Jundiai (late São Paulo Railway)
Author :
Chatterton, R.J.B. ; Rooney, D.H.
fDate :
11/1/1953 12:00:00 AM
Abstract :
The paper gives a short history of railway development in Brazil and describes the electrification at 3 000 volts d.c. of 118 single-track miles of main lines and sidings between Jundiai and Mooca in the State of São Paulo. Particulars are given of the equipment provided which comprised locomotives, multiple-unit trains, substations, track cabins and overhead lines. Some of the interesting details of the installation work and of experience gained under operating conditions are included.
Keywords :
railway electrification; travelling wave tubes;
Journal_Title :
Proceedings of the IEE - Part I: General
DOI :
10.1049/pi-1.1953.0068