• DocumentCode
    1372704
  • Title

    A new welder busway distribution system

  • Author

    Fisher, Lawrence E. ; Dailey, Robert W.

  • Author_Institution
    General Electric Company, Plainville, Conn.
  • Volume
    79
  • Issue
    3
  • fYear
    1960
  • fDate
    7/1/1960 12:00:00 AM
  • Firstpage
    203
  • Lastpage
    215
  • Abstract
    THE OHIO Stamping Plant of Chrysler. Corporation at Twinsburg, Ohio, covers an area of 1,500,000 sq ft (square feet), approximately 34 acres. Power is supplied by the Ohio Edison Company to supply the great number of motor loads and so forth for the heavy presses and other manufacturing equipment in the plant. The estimated short-circuit duty is 2,500,000 kva, based on long-range future plans. The estimated initial short-circuit duty is 600,000 kva 3 phase symmetrical.
  • Keywords
    Circuit breakers; Equations; Firing; Fuses; Plugs; Presses; Welding;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
  • Publisher
    ieee
  • ISSN
    0097-2185
  • Type

    jour

  • DOI
    10.1109/TAI.1960.6371667
  • Filename
    6371667