DocumentCode
1372704
Title
A new welder busway distribution system
Author
Fisher, Lawrence E. ; Dailey, Robert W.
Author_Institution
General Electric Company, Plainville, Conn.
Volume
79
Issue
3
fYear
1960
fDate
7/1/1960 12:00:00 AM
Firstpage
203
Lastpage
215
Abstract
THE OHIO Stamping Plant of Chrysler. Corporation at Twinsburg, Ohio, covers an area of 1,500,000 sq ft (square feet), approximately 34 acres. Power is supplied by the Ohio Edison Company to supply the great number of motor loads and so forth for the heavy presses and other manufacturing equipment in the plant. The estimated short-circuit duty is 2,500,000 kva, based on long-range future plans. The estimated initial short-circuit duty is 600,000 kva 3 phase symmetrical.
Keywords
Circuit breakers; Equations; Firing; Fuses; Plugs; Presses; Welding;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
Publisher
ieee
ISSN
0097-2185
Type
jour
DOI
10.1109/TAI.1960.6371667
Filename
6371667
Link To Document